Day 29: Introductions

This morning we met our Construction Supervisor, Ryan, in person for the first time. He shouted us a coffee and walked us through how he plans on running our job including how we will be kept informed.  He has a strong focus on ensuring that works are executed in a professional manner and particularly on establishing a good relationship with the neighbours.

We will have weekly check ins via phone, with the option of organising on-site meetings as required (providing we give 5 days notice). We notified him that we will be engaging our own independent building inspector and requested that he gives us about 5 days notice prior to a stage inspection so we can organise a time to accommodate everyone.

During this meeting he raised the topic of “fully” water proofing all the wet areas. Apparently, for an additional cost, you can get all the wet areas fully waterproofed as opposed to just meeting the Australian standards.  This is something that had not been brought to our attention previously and hence something we had not considered. More on this topic in a later post.

We also asked him for his opinion on our electrical layout. His view was that it was well planned and thought through with the exception of lighting over the sinks in the kitchen. He felt there could be more lighting there. After some additional research we agreed – once again more on this in a subsequent post.

Advertisements

One thought on “Day 29: Introductions

  1. Pingback: Day 29: Framing Starts – Our Carlisle Canterbury 44

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s