Day 34: First week of framing

We have reached the end of the first week of framing and a lot has been achieved.  The garage is now underway.  You can see, in the image below, the front double garage opening (4800mm) along with a single width opening (2400mm) at the rear.  This will give us a lot of flexibility in the future for access to the rear of the property.  We have also added two metres to the width of the garage.  You can see this from the frame section to the right of the double opening.  This makes the total internal width of the garage to be 7500mm.  Plenty of room for a work bench, shelving (and most importantly) a fridge!

Continue reading “Day 34: First week of framing”